Sustainable super-high-rise benefits from integrated security, safety and management
Critical building management and security systems at one of the most advanced super-high-rise towers, the landmark Wasl Tower in Dubai, are to be integrated with Maxxess eFusion technology.
The 302-metre multipurpose tower, which will be operated by the Mandarin Oriental Hospitality Group, incorporates offices, guest rooms, public areas and apartments, and is situated in a pivotal Dubai location. The Wasl Tower is designed with advanced sustainability features including natural shading and cooling, adaptive lighting, one of the world’s tallest natural ceramic facades, and a vertical boulevard.
eFusion was selected for the project because of the flexibility it allows, enabling rapid integration, off-the-shelf, with a wide choice of security, safety and business-critical technologies.
With a modular, building block approach, eFusion provides an umbrella management system and drives service efficiency by removing the need for operators to continually switch between systems.
A key use of the technology will be to integrate back-of-house operations at the Wasl guest apartments with front-of-house systems, for maximum ease of use and operational efficiency using the Maxxess unified platform. This eFusion solution comprises a 900-plus reader ASSA ABLOY VingCard access control system, a 1700 camera Hanwha surveillance system, and advanced key management with Deister ProxSafe, and it will use the BACnet protocol to integrate the building management system (BMS). The Tower will also benefit from Maxxess VisitorPoint visitor management system, a Zenitel intelligent communication system and disabled call-to-assist alarms.
The VisitorPoint integration will improve the guest and resident experience, reduce administration and front-desk queuing, and ensure smooth running of functions from visitor and contractor management to collections and deliveries, and security.
“The challenge with projects of this scale is to find a simple, straightforward platform that communicates with everything and works with all the systems involved,” says Lee Copland, Managing Director EMEA, Maxxess. “By keeping it simple, and integrating with the widest choice of technologies, Maxxess removes the complexity.”
The Wasl Tower project is the latest of a growing number of mixed-use developments, including hotels, retail, office and residential complexes to use eFusion to streamline security, safety and facilities management. Last year Maxxess won an Intersec Award for its major eFusion implementation at Bluewaters Island.